Veteran-owned · FL CGC1541854 · Licensed & insuredResidential + commercial · Northeast + Central Florida
Call nowFree estimate

JBH project story

Flagler Estates Custom Home with Loft

A St. Johns County custom home with a loft and dormer revision, showing coordinated framing, stair integration, roof dry-in, plumbing top-out, HVAC rough, and electrical sequencing.

Custom home with loft / bonus roomIn progress · Dry-in and rough MEP
Crew framing a loft and dormer inside a custom home in Flagler Estates Florida
Flagler Estates · St. Johns County, Florida
Project typeCustom home with loft / bonus room
Service areaFlagler Estates · St. Johns County, Florida
Documented stageIn progress · Dry-in and rough MEP

Project overview

Construction decisions made visible.

The loft and dormer make this Flagler Estates custom home a coordination-heavy build. The revision affects the roof geometry, stairs, structural framing, mechanical distribution, and the inspections that release each following trade.

JBH’s daily logs document the work as it moved from revised framing through top-out and dry-in. The result is a clear record of how design changes were translated into field tasks without losing sight of the next inspection or handoff.

What the work involved

  • Custom-home framing with integrated loft and dormer
  • Stair layout and revised roof-framing coordination
  • Plumbing top-out, HVAC rough, and electrical sequencing
  • House wrap, roofing underlayment, inspections, and field cleanup

Field record

Documented milestones

Project notes are translated into a clear construction sequence so owners can see what happened and why the next step matters.

01

Daily log · Aug. 28, 2026

Dormer, stairs, and roof framing advanced

The project record documented the dormer framed, stair work in progress, and one side of the roof completed with no reported blockers.
02

Daily log · Aug. 31, 2026

Framing and plumbing reached inspection sequence

Framing advanced to an inspection-ready point, plumbing top-out was complete, and the next inspections and trade handoffs were coordinated.
03

Daily log · Sept. 3, 2026

HVAC rough and house wrap completed

HVAC rough work and house wrap were recorded complete while roofing underlayment, shingles, and electrical rough were sequenced next.

Have a property, plan set, or renovation idea?

Let’s review the next move.

Request a free estimate